The company of 55.000 m2, spread over 25 departments, cultivates and sells young vegetable plants. The project comprised new construction of one section and replacement of the remaining section.
 
We have realized:

  • Heating
  • 11.600 kW boiler system
  • 1.500 m3 heat storage
  • Suspended monorail heating system
  • Mobile grow pipe heating system (the heating pipes are hoisted up by steel wires via a hoisting motor. The heating pipes are thus always suspended at the right level for optimum heating: just above the plants, whatever their stage of development)
  • Floor heating in the concrete floor